Petrol Station, Staines

 

The site located in a residential area of south London with properties bounding three sides of the forecourt.
A failure on a four star suction line led to a loss of product and the subsequent impact to the underlying soils and groundwater.
An insitu multi phase extraction system was installed together with a migration control barrier to the site perimeter.
Due to the high volume of sales at the site the client required that the site remained operational throughout the installation and subsequent nine month remediation period.

Client
Major oil company 
Site
Staines, Surrey
Problem
Hydrocarbon impact to the soil and groundwater
Technologies utilised
Multi phase extraction, liquid and vapour phase carbon absorption, offsite migration and permanent vapour alleviation measures, telemetry monitoring and control
Remediation criteria
Free phase < 1mm, VOC’s < 50ppm, soil TPH < 120mg/kg, groundwater TPH < 23mg/l
Validation
Independent consultant