Dyes and Chemical Manufacturing Facility, Huddersfield

 

This former dyes and chemical manufacturing facility housed an existing effluent treatment plant which had to be demolished as part of the redevelopment works.
Due to the contamination present at the site a temporary effluent treatment plant had to be installed with a capacity to treat up to 50 m3/hr of contaminated waters.
The replacement plant was designed and built in a modular design in order that it could be installed, commissioned and be fully operational within 24 hours of the existing plant being taken out of service.
Client
Design and build contractor
Site
Former dyes and chemical manufacturing facility, Huddersfield, West Yorkshire
Problem
Soils contaminated with hydrocarbons and chlorinated solvents. Surface waters and groundwater's contaminated with chlorinated solvents, aniline, phenols fluorocene and rhodamine
Technologies utilised
Ex situ biological treatment of soils, insitu treatment of groundwater by pump and treat and hydrogen release compounds. Inline pH Adjustment, flocculants and chemical dosing
Remediation criteria
Suite of soil and groundwater criteria set by independent consultant and Environment Agency. Discharge criteria set by Water Authority
Validation
Spot sampling and analysis by Water Authority


 

 